WORKLOAD ANALYSIS
Updated
08/05/2008
2006 Workload analysis process
In January of 2006, Kentucky began an in depth study
of the workload across the state. Field Offices participated by providing
information on applications and contracts for all the Farm Bill Programs as well
as State and Local Cost Share Programs and conservation planning. Weights were
given to each application and contract depending on the level of work required
at the field level. Performance from the previous year was also taken into
consideration.
Scores were calculated using the methodology provided in
this section. The map that follows is a result of these scores.
ABC Analysis – Activity Based Cost
Analysis
- In September of 2006, the National NRCS Office
conducted the ABC Workload Analysis. The results of that process serve as a
compliment to the original Workload Analysis conducted earlier in the year.
GAP Analysis ABC Analysis – Activity
Based Cost Analysis
- A final study was conducted using the ABC data. The
number of practices yet to be applied (according to the National
Conservation Planning Database (NCPD)) was multiplied by the time it takes
to complete the practice (averaged by Area ? from ABC data). The total hours
were compared against the current staff level and the GAP analysis was
formed.
- The results of the GAP Analysis using the proposed
office combinations are included in this section.
Workload Analysis Methodology
Data Collected
- Total # of
applications taken in 2006 for all programs
- Total # of active
Farm Bill contracts, easements, etc.
- Practices yet to be applied for EQIP, WHIP, & State Cost Share for all program years
- 2006 State Cost Share applications received
- Local Cost Share
applications received in 2006
- Urban land
conservation planning acres and conservation to be applied for 2006
- Conservation Technical Assistance (CTA) field office level goals for 2006
Scoring Process
- The SRC staff, Area Conservationists, Area Resource Conservationists, and State Conservation Engineer were asked to assign a workload score (between 1 and 10) to the following: <
- Application
process for each program, scoring the field staff separate from the
technical staff
- Contract
development process for each program, scoring the field staff separate
from the technical staff
- Each individual
practice, scoring the field staff separate from the technical staff
- A typical unit
size was also assigned for each practice
- Those scores were
then averaged for each of those categories and used in the overall scoring
calculation
Formulas
-
Application Score
= total number of applications by county x average application field staff
workload score for the program. All program application scores were then
summed to get one application score.
-
Active Contract/Easement Score = total number of contracts/easements by county x average contract field
staff workload score for the program. All program application scores were
then summed to get one contract/easement score.
-
Practice Score
= (Individual practice acres for each county/Average practice typical unit)
field staff workload score for practice. All individual practices scores
were then totaled together.
-
An application score and active contract score was developed for Farm Bill
Program separate from CTA
programs. The two individual scores were added together for one final
overall county workload score.
Office Combination
Methodology
NRCS in Kentucky serves 120
counties from 95 staffed field offices. The Conservation Operations budget
continues to be cut leaving less each year to cover expenses like rent and
utilities. Our lease obligation alone amounts to over $1.7 million annually.
In addition to this, Kentucky
has experienced a loss of 17 DC positions over the last year, positions that
will not be refilled due to budget constraints. It is for these reasons that a
restructuring plan was initiated.
Considerations
- In most cases, the
smaller workload office was combined with the larger workload headquarters
office.
- RC&D boundaries
were used with exceptions only where NRCS was not aligned with FSA. The
RC&D boundaries were based on the resource base which is an important piece
of criteria in the office groupings.
- FSA Phase I and II
office combinations were considered and in most cases the placement of the
NRCS headquarters was in agreement with the proposed FSA headquarters.
Through FSA’s restructuring plan, farmer travel patterns were considered and
placement of the headquarters considered the location where more farmers
would benefit.
- Counties that were
staffed with GS-12 DC positions were given priority for headquarter
locations in most cases.
- Combinations were
also reviewed based on the locations of Resource Conservationists.
- The combinations
were arrived at without regard to personalities in office groupings.
Click here
for
Executive Summary
Click here
for
Purpose and Teamwork Concept
Click here
for
map of the consolidated counties and offices
Click here
for
Workload Analysis Maps
<
Back to Kentucky Homepage
| |
Information
For:


Information
For:
|